Latest news from the Himalaya and Karakoram

Monday 1 June 2009

Our Summit day on Makalu

Photo: climbing ridge to Makalu summit

Mick and myself left Base Camp on May 17th however were forced to spend an extra night at Camp 1 before moving up Makalu La because 18th was a very windy day. On May 19th the weather was more settled and we climbed up the ropes to the Makalu La for the third time on the expedition. On the way up we passed the Indian group from HMI Darjeeling coming down off the summit from earlier that morning. 

On arrival at the Makalu La Mick was disappointed to find no traces of his Bibler tent that had been left from our earlier visit, it had been blown off the mountain by the strong winds of the last few days. Luckily we had brought with us another tent (Black Diamond Firstlight), this is a super lightweight tent at only 1kg and we hoped would provide us adequate shelter! May 20th we moved up to High Camp on the edge of the summit icefall at around 7,800m, we were feeling confident as knew if the current good weather held we should have a good chance for the summit tomorrow. After digging out a platform for the tent we settled into the tent to start hydrating and resting before our anticipated departure for the summit in the early hours. 

During late afternoon we had no problems melting snow with our stove, however as the sun set and temperatures dropped it took longer and longer to get a pot of water ready until it stopped working completely. Eventually we gave up and tried to get some sleep. The original plan was to leave High Camp at 2am although after coaxing the stove back to life for a few hours we managed to get another litre of water and then while waiting for another brew both Mick and myself fell asleep! We woke when it got light around 5am and thought that maybe it was time to get moving…. 

Just after 6am we started out from High Camp, we climbed quickly through the icefall and then started on the very long snow slope towards the French Couloir. We experienced wind slab on top of loose snow that made for difficult conditions for Mick breaking trail. It was a relief to finally finish the snow slope and then enter the French Couloir, the route soon heads to the left and onto mixed ground until reaching the corniced summit ridge at 8,300m. The false summit can be seen along the ridge, this is climbed via a snowy gulley then there is a further corniced ridge to the true summit at 8,462m. 

We arrived to the summit at 4pm in the afternoon and then after photos and admiring the view we quickly descended to High Camp getting in just after 7pm just as the sun was setting. We had not planned these timings however as it turned out we were only climbing during daylight hours so we experienced warm & sunny conditions throughout the day with very light winds. We were very fortunate to have Makalu to ourselves there were no other climbers on the mountain that day especially when considering Everest across the valley was heavily crowded on one of the busiest days for commercial expeditions. 

On May 22nd we descended to Makalu La where the weather rapidly deteriorated with poor visibility and high winds, we had a cold descent down the ropes to Camp 1. We were pretty tired when on arrival so decided to spend the night and continue to Base Camp on the next day. Getting to Base Camp on 23rd we had to quickly pack our gear as porters had been arranged, after lunch we walked down to Hilary Base Camp. From there we walked to the airstrip in Tumlingtar in four long days.

Photo: Roland and Mick back in Base Camp 

Finally many thanks to our Base Camp crew for looking after us so well, danyibad Dendi Sherpa, Dawa Sherpa, Sonam, Dawa and Pudam.

Sunday 31 May 2009

Summit push on Makalu!

This message was written on May 16th shortly before we headed up for our final summit push although was never published on the blog, I have included below for completeness:

Following my last dispatch the weather has improved and the recent forecasts suggest that the late May summit window is finally here!

The Basque team set off up the West Ridge/ Pillar yesterday and this morning Spanish Carlos and Hose Marias left Base Camp for their summit attempt.

Tomorrow Mick and myself will also leave for a summit push dates as follows Camp 1 May 17th, Camp 2 Makalu La May 18th, High Camp 19th and summit 20th.

I understand that the large Indian team from HMI Darjeeling will also move up tomorrow, however as they using supplemental oxygen they might go direct from the Makalu La to the summit.

Saturday 30 May 2009

Makalu Expedition Photos 4: Makalu summit!!

Photo: Camp 3 on edge of icefall


Photo: climbing through icefall

Photo: snowslope after icefall

Photo (Mick Parker): Roland on snowslope

Photo: Mick approaching French couloir

Photo: French couloir

Photo: Mick above French couloir

Photo: Everest and Lhotse

Photo: corniced summit ridge

Photo: Mick climbing false summit

Photo (Mick Parker): Roland climbing false summit

Photo: Mick on final summit ridge

Photo: Roland on the summit!

Photo: Mick on the summit!

Photo: descending summit ridge

Makalu Expedition Photos 3: Climbing to Camp 2 on Makalu La at 7,300m

Photo: Makalu La


Photo: Mick climbing to Makalu La

Photo: snowfield half way up to Makalu La

Photo: ice couloir above snowfield

Photo: mixed ground below Makalu La

Photo: below Makalu La

Photo: Camp 2 on Makalu La at 7,300m

Photo: view of Makalu Two

Photo: view east from Makalu La

Photo: Makalu La

Photo: view of summit from Makalu La

Makalu Expedition Photos 2: Makalu Advanced Base Camp, Puja and Camp 1

Photo: porters approaching Advanced Base Camp

Photo: Makalu West Ridge

Photo: trail to Advanced Base Camp

Photo: Advanced Base Camp

Photo: Puja ceremony

Photo: Puja ceremony

Photo: Puja ceremony

Photo: Puja ceremony

Photo: Deposit camp on edge of glacier

Photo: serac en route to Camp 1

Photo: route to Camp 1

Photo: route to Camp 1

Photo: Camp 1 with Everest & Lhotse

Photo: view of Tibet from Camp 1

Photo: view of Chamlang and Baruntse from Camp 1

Photo: Makalu La

Makalu Expedition Photos 1: Trekking to Base Camp

Photo: Mick at Tumlingtar


Photo: terraced fields at Maneybhanjang

Photo: ploughing fields

Photo: Paul and Shekhar

Photo: mani wall

Photo: farmhouse near Seduwa

Photo: suspension bridge over Arun River

Photo: Shipton La

Photo: Shipton La

Photo: lakes near Shipton La

Photo: Shipton La

Photo: Shipton La

Photo: descending Shipton La

Photo: Barun Valley

Photo: campsite at Langmale Kharka

Photo: campsite at Mera

Photo: walking near Sherson

Photo: Sherson

Photo: Hilary (lower) Base Camp

Photo: Mt Makalu

The Mountain Company